PT电子游戏

EN

PT电子游戏(官方)最新IOS/安卓版/手机版APP下载 PT电子游戏(官方)最新IOS/安卓版/手机版APP下载
PT电子游戏(官方)最新IOS/安卓版/手机版APP下载

Industrial Layout

产业布局

Concentrating Solar Power

With the establishment of R&D and engineering platform, XIZICE has been researching in the field of CSP for more than 10 years. The Delingha 10MW water working fluid power station has been running stably for 8 years; the single tower and molten salt working fluid modification has been completed and has been running stably for more than 5 years. The Delingha 50MW tower molten salt CSP plant has been running stably for more than 3 years.

PT电子游戏(官方)最新IOS/安卓版/手机版APP下载
【网站地图】【sitemap】